Construction is about half finished on the new Northside Library. The room is all done, and the frames for all the windows have been put in. On the interior, the sheet rock is just beginning to be hung. The Limestone tiles for the outside of the building are getting started this week on the side of the building facing the tot lot. They construction team has begun installing the electricity, plumbing and heating into the building.